Skip to main content

Permit(s) needed for a Forest and Park Service

ADEQ

Permit(s) needed for a Forest and Park Service

Revised On: Apr. 25, 2024 - 4:45 p.m.

The following is a required permit when running a Forest and Park Service in Arizona:

You may need all or some of the following permits:

  • If you have biomass, you may need an Air Curtain Incinerator GP  | Learn More >
  • If you have asbestos, you may need an Asbestos Renovation and Demolition Notification Requirement | Learn More >
  • If you have a generator, you may need a Generators GP | Learn More >
  • If you have hazardous waste to dispose of, you may need a Hazardous Waste EPA ID Number | Learn More >
  • If you have a waste or TSDF facility, you may need a Solid Waste Facility Plan Approval | Learn More >
  • If composting, you may need a Solid Waste Notification for Composting | Learn More >
  • If you generate special waste, you may need an Application for Special Waste ID Numbers | Learn More >
  • If you have an underground storage tank (UST), you may need a Notification of UST Form | Learn More >
  • If you discharge pesticides to US waters, you may need a Pesticide GP | Learn More > 
  • 1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required. However, best management practices (BMPs) must be followed.”
  • 1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required. However, best management practices (BMPs) must be followed.”
  • 1.08 GP: Toilet or Privy: “Type 1 General Permit: No notification is required. However, best management practices (BMPs) must be followed.”
  • 2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More >
  • 2.03 GP: Hydrologic Tracer Studies | Learn More > 
  • 3.01 GP: Lined Impoundments | Learn More > 
  • 3.05 GP: Disposal Wetlands | Learn More > 
  • Type 2 (Class A to C) Reclaimed Water GP for Direct Reuse of Reclaimed Water | Learn More >
  •  If you discharge water pollutants, you may need an Individual APP | Learn More > 
  • If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | Learn More > 
  • If you have a drywell, you may need a Drywell Registration | Learn More >
  • If your industry has stormwater discharges due to construction, you may need a GP Associated with Construction Activity (Stormwater)  | Learn More > 
  • If you discharge pollutants into US waters, you may need an AZDPES Individual Permit | Learn More >

Air Quality Permit Liaison
           Ph: 602-771-2338
          Email >

Water Quality Permit Liaisons
         For: Groundwater
                Ph: 602-771-0175
                Email >
         For: Drinking Water
               Ph: 602-771-7570
         For: Surface Water
                Ph: 602-771-1440
                Email >

Waste Permit Liaisons
         For: Solid and Biohazardous
                Ph: 602-771-4136
                Email >
         For: Hazardous Waste
                Ph: 602-771-0349
                Email >
         For: USTs
                Ph: 602-771-4196
                Email >