Permit(s) needed for a Concrete Batch Plant

ADEQ

Permit(s) needed for a Concrete Batch Plant | ADEQ

Revised On: May. 6th, 2025 - 10:16 pm

You may need all or some of the following permits:

  • If your industry produces concrete, you may need a Concrete Batch Plant GP | Learn More >
  • If your industry produces crushed stone, you may need a Crushing and Screening Plant GP | Learn More >
  • If you have hot mix asphalt, you may need a Hot Mix Asphalt Plants GP | Learn More >
  • If you have a boiler + generator, you may need an Air Quality Individual Permit | Learn More >
  • If your industry has stormwater discharges due to construction, you may need an AZPDES GP Associated with Construction Activity (Stormwater) | Learn More >
  • 1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
  • 1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
  • 1.08 GP: Toilet or Privy: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
  • 1.12 GP: Discharge of Wastewater Resulting from Washing Concrete from Trucks, Pumps, and Ancillary Equipment: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
  • 2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More >
  • 2.03 GP: Hydrologic Tracer Studies | Learn More >
  • 3.01 GP: Lined Impoundments | Learn More >
  • 3.03 GP: Vehicle and Equipment Washes | Learn More >
  • 3.05 GP: Disposal Wetlands | Learn More >
  • 3.07 GP: Tertiary Treatment Wetlands | Learn More >
  • If you discharge water pollutants, you may need an Individual APP | Learn More >
  • If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | Learn More >
  • If you have a drywell, you may need a Drywell Registration | Learn More >
  • If your industry has stormwater discharges due to mining, then you may need an AZPDES MSGP Mining Permit | Learn More >
  • If your industry has stormwater discharges, you may need an AZPDES MSGP Industrial Stormwater or No Exposure Certification | Learn More >

ADEQ Main Office
1110 W. Washington St.
Phoenix, AZ 85007

602-771-2300 — General Information
800-234-5677 — Toll-Free
711 — Teleprinter Services

Directions to ADEQ >
Parking at ADEQ >


Community Liaisons >
Ombudsman Citizen's-Aide >
ADEQ Contact List >


Southern Regional Office (SRO) >
400 W. Congress St., Suite 433
Tucson, AZ 85701

520-628-6733 — General Information
888-271-9302 — Toll-Free

Parking at ADEQ — SRO >