Permit(s) needed for a Concrete Batch Plant
You may need all or some of the following permits:
If your industry produces concrete, you may need a Concrete Batch Plant GP | Learn More >
If your industry produces crushed stone, you may need a Crushing and Screening Plant GP | Learn More >
If you have hot mix asphalt, you may need a Hot Mix Asphalt Plants GP | Learn More >
If you have a boiler + generator, you may need an Air Quality Individual Permit | Learn More >
If your industry has stormwater discharges due to construction, you may need an AZPDES GP Associated with Construction Activity (Stormwater) | Learn More >
1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.08 GP: Toilet or Privy: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.12 GP: Discharge of Wastewater Resulting from Washing Concrete from Trucks, Pumps, and Ancillary Equipment: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More >
2.03 GP: Hydrologic Tracer Studies | Learn More >
3.01 GP: Lined Impoundments | Learn More >
3.03 GP: Vehicle and Equipment Washes | Learn More >
3.05 GP: Disposal Wetlands | Learn More >
3.07 GP: Tertiary Treatment Wetlands | Learn More >
If you discharge water pollutants, you may need an Individual APP | Learn More >
If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | Learn More >
If you have a drywell, you may need a Drywell Registration | Learn More >
If your industry has stormwater discharges due to mining, then you may need an AZPDES MSGP Mining Permit | Learn More >
If your industry has stormwater discharges, you may need an AZPDES MSGP Industrial Stormwater or No Exposure Certification | Learn More >