Permit(s) needed for a Concrete Batch Plant
Revised on: June 14, 2016 - 11:31am
You may need all or some of the following permits:
If your industry produces concrete, you may need a Concrete Batch Plant GP | Learn More >
If your industry produces crushed stone, you may need a Crushing and Screening Plant GP | Learn More >
If you have hot mix asphalt, you may need a Hot Mix Asphalt Plants GP | Learn More >
If you have a boiler + generator, you may need an Air Quality Individual Permit | Learn More >
If your industry has stormwater discharges due to construction, you may need an AZPDES GP Associated with Construction Activity (Stormwater) | Learn More >
1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.08 GP: Toilet or Privy: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.12 GP: Discharge of Wastewater Resulting from Washing Concrete from Trucks, Pumps, and Ancillary Equipment: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More >
2.03 GP: Hydrologic Tracer Studies | Learn More >
3.01 GP: Lined Impoundments | Learn More >
3.03 GP: Vehicle and Equipment Washes | Learn More >
3.05 GP: Disposal Wetlands | Learn More >
3.07 GP: Tertiary Treatment Wetlands | Learn More >
If you discharge water pollutants, you may need an Individual APP | Learn More >
If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | Learn More >
If your industry has stormwater discharges due to mining, then you may need an AZPDES MSGP Mining Permit | Learn More >
If your industry has stormwater discharges, you may need an AZPDES MSGP Industrial Stormwater or No Exposure Certification | Learn More >
This listing may not be comprehensive depending upon the specifics of your facility. Additional permits or registrations may be needed, therefore ADEQ recommends you contact the Permit Liaisons if unsure of permit requirements.