Skip to main content

Permit(s) needed for a Petroleum Products Processor

Permit(s) needed for a Petroleum Products Processor

Revised On: Sep. 17th, 2024 - 02:57 pm

Revised On: May. 5, 2024 - 6:00 p.m.

What is a Petroleum Products Processor:

You may need all or some of the following permits:

If you have a boiler + generator, you may need an Air Quality Individual Permit | Learn More > 

If you have contaminated soil , you may need a Soil Vapor Extraction Units GP | Learn More >

If you generate special waste, you may need an Application for Special Waste ID Numbers | Learn More >

If you have hazardous waste to dispose of, you may need an Application for a Hazardous Waste EPA ID Number | Learn More > 

If you have underground storage tank, may need a Notification of UST Form | Learn More >

 

1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

1.08 GP: Toilet or Privy : “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More > 

2.03 GP: Hydrologic Tracer Studies | Learn More > 

3.01 GP: Lined Impoundments | Learn More > 

3.03 GP: Vehicle and Equipment Washes | Learn More > 

3.05 GP: Disposal Wetlands | Learn More > 

3.07 GP: Tertiary Treatment Wetlands | Learn More > 

 

If your industry has stormwater discharges, you may need an AZPDES MSGP Industrial Stormwater or No Exposure Certification | Learn More > 

If you discharge water pollutants, you may need an Individual APP | Learn More > 

If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | Learn More >  

If you have a drywell, you may need a Drywell Registration | Learn More >  

If your industry has stormwater discharges due to mining, then you may need an AZPDES MSGP Mining Permit | Learn More > 

If using reclaimed water, you may need a Direct Reuse of Reclaimed Water Individual Permit | Learn More >  

If you discharge pollutants into US waters, you may need an AZDPES Individual Permit  | Learn More >