Permit(s) needed for Glass, Clay, Cement, Concrete and Gypsum Products (Sector E)
You may need all or some of the following permits:
If you have hot mix asphalt, you may need a Hot Mix Asphalt Plants GP | Learn More >
If you have hazardous waste to dispose of, you may need an Application for a Hazardous Waste EPA ID Number | Learn More >
If your industry has stormwater discharges, you may need an AZPDES Industrial Stormwater Non-Mining MSGP | Learn More >
If your industry has stormwater discharges due to construction, you may need an AZPDES GP Associated with Construction Activity (Stormwater) | Learn More >
1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
If you have a drywell, you may need a Drywell Registration | Learn More >
This listing may not be comprehensive depending upon the specifics of your facility. Additional permits or registrations may be needed, therefore ADEQ recommends you contact the Permit Liaisons if unsure of permit requirements.