ADEQ
Permit(s) needed for Paper and Allied Products (Sector B)
Revised On: May. 9th, 2025 - 05:11 pm
You may need all or some of the following permits:
- If composting, may need a Solid Waste Notification for Composting | Learn More >
- 1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
- 1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
- 1.08 GP: Toilet or Privy: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
- 2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More >
- 2.03 GP: Hydrologic Tracer Studies | Learn More >
- 3.01 GP: Lined Impoundments | Learn More >
- 3.03 GP: Vehicle and Equipment Washes | Learn More >
- 3.07 GP: Tertiary Treatment Wetlands | Learn More >
- If you discharge water pollutants, you may need an Individual APP | Learn More >
- If your industry has stormwater discharges, you may need an AZPDES Industrial Stormwater Non-Mining MSGP | Learn More >
- If you discharge pollutants into US waters, you may need an AZDPES Individual Permit | Learn More >