Permit(s) needed for a Sawmill
A sawmill is a facility where logs are cut into lumber.
You may need all or some of the following permits:
If you have a boiler + generator, you may need an Air Quality Individual Permit | Learn More >
If you have hazardous waste to dispose of, you may need an Application for a Hazardous Waste EPA ID Number | Learn More >
If you have a Solid Waste Facility Plan, you may need a Solid Waste Facilities Operation Notification | Learn More >
1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.08 GP: Toilet or Privy: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More >
2.03 GP: Hydrologic Tracer Studies | Learn More >
3.01 GP: Lined Impoundments | Learn More >
3.03 GP: Vehicle and Equipment Washes | Learn More >
3.07 GP: Tertiary Treatment Wetlands | Learn More >
If you discharge water pollutants, you may need an Individual APP | Learn More >
If your industry has stormwater discharges, you may need an AZPDES MSGP Industrial Stormwater or No Exposure Certification | Learn More >
State Water Quality Certification, CWA Section 401 | Learn More >
This listing may not be comprehensive depending upon the specifics of your facility. Additional permits or registrations may be needed, therefore ADEQ recommends you contact the Permit Liaisons if unsure of permit requirements.