Revised On: Sep. 17th, 2024 - 02:51 pm
Revised On: May. 5, 2024 - 5:06 p.m.
What is Non-Metallic Mineral Mining and Dressing (Sector J):
You may need all or some of the following permits:
If you have a boiler + generator, you may need an Air Quality Individual Permit | Learn More >
If you have hazardous waste to dispose of, you may need an Application for a Hazardous Waste EPA ID Number | Learn More >
1.01 GP: Discharge From A Sand and Gravel Operation, Placer Mining Operation, or Other Similar Acitivity: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.06 GP: Burial of Mining Industry Off-road Motor Vehicle Waste Tires: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed."
1.08 GP: Toilet or Privy: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.12 GP: Discharge of Wastewater Resulting from Washing Concrete from Trucks, Pumps, and Ancillary Equipment: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More >
2.02 GP: Intermediate Stockpiles at Mining Sites | Learn More >
2.03 GP: Hydrologic Tracer Studies | Learn More >
3.01 GP: Lined Impoundments | Learn More >
3.03 GP: Vehicle and Equipment Washes | Learn More >
3.04 GP: Non-Stormwater Impoundments at Mining Sites | Learn More >
3.06 GP: Constructed Wetlands to Treat Acid Rock Drainage at Mining Sites | Learn More >
3.07 GP: Tertiary Treatment Wetlands | Learn More >
If you discharge water pollutants, you may need an Individual APP | Learn More >
If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | Learn More >
If you have a drywell, you may need a Drywell Registration | Learn More >
If your industry has stormwater discharges due to mining, then you may need an AZPDES MSGP Mining Permit | Learn More >