Permit(s) needed for Land Transportation and Warehousing (Sector P)

You may need all or some of the following permits:

 If you have hazardous waste to dispose of, you may need an Application for an EPA ID Number | Learn More >  

 1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

 1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

 1.08 GP: Toilet or Privy: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

 2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More > 

 2.03 GP: Hydrologic Tracer Studies | Learn More >

 3.01 GP: Lined Impoundments | Learn More >

 3.03 GP: Vehicle and Equipment Washes | Learn More >

 3.07 GP: Tertiary Treatment Wetlands | Learn More >

 If you discharge water pollutants, you may need an Individual APP | Learn More > 

 If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | Learn More >

 If you have a drywell, you may need a Drywell Registration | Learn More > 

 If you have a sewage collection system, you may need a Sewage Collection System (Type 4.01 General APP) | Learn More > 

 If you have a drinking water system, you may need a Drinking Water Facility Approval to Construct | Learn More > 

 If your industry has stormwater discharges, you may need an AZPDES Industrial Stormwater Non-Mining MSGP | Learn More >