Revised On: Sep. 17th, 2024 - 11:36 am
Revised On: Apr. 22, 2024 - 3:00 p.m.
You may need all or some of the following permits:
If you have a boiler + generator, you may need an Air Quality Individual Permit | Learn More >
If you treat, store, or dispose of hazardous waste, you may need a Hazardous Waste TSD Facility Permit | Learn More >
If you have hazardous waste to dispose of, you may need an Application for a Hazardous Waste EPA ID Number | Learn More >
If your industry has stormwater discharges, you may need an AZPDES Industrial Stormwater Non-Mining MSGP | Learn More >
1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.
1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.
1.08 GP: Toilet or Privy : Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.
2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More >
2.03 GP: Hydrologic Tracer Studies | Learn More >
3.01 GP: Lined Impoundments | Learn More >
3.03 GP: Vehicle and Equipment Washes | Learn More >
3.07 GP: Tertiary Treatment Wetlands | Learn More >
If you discharge water pollutants, you may need an Individual APP | Learn More >
If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | Learn More >
If you have a drywell, you may need a Drywell Registration | Learn More >
If using reclaimed water, you may need a Direct Reuse of Reclaimed Water Individual Permit | Learn More >
If you have a drinking water system, you may need a Drinking Water Facility Approval to Construct | Learn More >