Posted On: Aug. 25th, 2026 - 03:43 pm
On Aug. 26, 2026, the comment period begins for the preliminary decision to issue an Individual Aquifer Protection Permit to Arizona Electric Power Cooperative (AEPCO) for a new peaking natural gas-fired electric generating facility located in Mohave Valley, Arizona. The comment period ends Sept. 24, 2026.
Aquifer Protection Permit (APP) No.: 515173
The requirements in this permit will allow the permittee to comply with the two key requirements of the Aquifer Protection Program: 1) meet Aquifer Water Quality Standards at the Point of Compliance; and 2) demonstrate Best Available Demonstrated Control Technology.
Permittee:
AEPCO
Facility:
Mohave Energy Park
2897 E. King Street
Mohave Valley, Arizona 86440
Mohave County
Review Documents:
Public Comment Period:
- Dates: Aug. 26, 2026 – Sept. 24, 2026
Comments may be submitted as follows:
- By Email | Send Email >
- By Mail (Must be postmarked or received by Sept. 24, 2026):
ADEQ
Water Quality Division, Groundwater and Reuse
Attn: Maribeth Greenslade
1110 W. Washington St.
Phoenix, AZ 85007