Revised On: Oct. 1st, 2026 - 09:21 am
On Aug. 26, 2026, the comment period begins for the preliminary decision to issue an Individual Aquifer Protection Permit to Arizona Electric Power Cooperative (AEPCO) for a new peaking natural gas-fired electric generating facility located in Mohave Valley, Arizona. The comment period has been extended through Oct. 30, 2026.
Aquifer Protection Permit (APP) No.: 515173
The requirements in this permit will allow the permittee to comply with the two key requirements of the Aquifer Protection Program: 1) meet Aquifer Water Quality Standards at the Point of Compliance; and 2) demonstrate Best Available Demonstrated Control Technology.
Permittee:
AEPCO
Facility:
Mohave Energy Park
2897 E. King Street
Mohave Valley, Arizona 86440
Mohave County
Review Documents:
Public Comment Period:
- Dates: Aug. 26, 2026 – Oct. 30, 2026
Comments may be submitted as follows:
ADEQ
Water Quality Division, Groundwater and Reuse
Attn: Maribeth Greenslade
1110 W. Washington St.
Phoenix, AZ 85007
- At the Public Hearing in Mohave Valley, Arizona | Wednesday, Oct. 7, 2026, 6 p.m. | View Details >