Posted On: Apr. 3rd, 2025 - 03:22 pm
On April 4, 2025, the comment period begins for the proposal to issue an Arizona Pollution Discharge Elimination System (AZPDES) renewal permit for the Town of Gila Bend Wastewater Treatment Plant (WWTP) located in Maricopa County, Arizona. The comment period ends May 5, 2025.
AZPDES Permit No.: AZ0020231
Permittee:
Town of Gila Bend
Facility:
Town of Gila Bend WWTP
1650 W. Watermelon Road
Gila Bend, AZ 85337
Maricopa County
The Town of Gila Bend applied for a renewal AZPDES permit for the proposed discharge of up to 0.7 million gallons per day (MGD) of treated domestic wastewater from Gila Bend WWTP Outfall to the Unnamed Wash (EDW) to the confluence with the Gila River in the Middle Gila River Basin in Township 5 S, Range 5 W, Section 26, in Maricopa County, Arizona. The Town of Gila Bend WWTP is a publicly-owned treatment works that receives domestic wastewater from residential, commercial, and industrial sources in Gila Bend. The facility consists of treatment lagoons and stabilization ponds. Smaller settling ponds are used as wetlands. The facultative lagoon system does not generate biosolids.
Review Documents:
Public Comment Period:
Dates: April 4, 2025 – May 5, 2025
Comments may be submitted as follows:
- By Email | Email >
- By Mail (Must be postmarked or received by May 5, 2025):
ADEQ
Water Quality Division, Surface Water Protection
Attn: Juliana Lewis
1110 W. Washington St.
Phoenix, AZ 85007