WPD | VRP | Adair Memorial Park

VRP Site

Adair Memorial Park

Revised On: Nov. 15, 2023 - 4:00 p.m.

Location: 

  • Approximately 1.5 miles west of the intersection of Adair Park Rd and S. Avenue 13E (off of Highway 95) Yuma, Arizona 85365

Acceptance Into Voluntary Remediation Program (VRP):

  • March 8, 2006

Contaminants of Concern (COCs):

  • Lead

Affected Media:

  • Soil

What are My Health Risks:

For Soil | There is little to no health risk unless there is contact with skin or ingestion of contaminated soil

Site Summary:

  • Engineering controls in the form of earthen and asphalt caps, drainage systems, and retention ponds have been utilized since 2006 to prevent exposure from the affected soil
  • Site is being evaluated for a Declaration of Environmental Use Restriction (DEUR) utilizing engineering controls | What is a DEUR? >
  • Work Plan (Soil Sampling) submitted to ADEQ in July 2018
  • ADEQ reviewed and approved the Work Plan in December 2018
  • In June 2019, Yuma County submits a Findings Report
  • In December, 2019 , ADEQ approved the Findings Report
  • June 2020, Yuma County submitted a Remedial Action Plan and was conditionally approved by ADEQ
  • In December 2020, Yuma County begins their assessment of the historical tailings pile and storm-water drainage features
  • In February 2021, ADEQ reviewed and approved Site Design Drawings submitted by Yuma County
  • In January 2022, ADEQ received a Remedial Action Report, approved by ADEQ April 2022
  • Yuma County submitted a final Conditional No Further Action Request to ADEQ in May 2022
  • A 45-day Public Comment Period on the Conditional No Further Action request was issued on May 29, 2022
  • Volunteer is currently working with the ADEQ DEUR Coordinator to record an Engineering Control DEUR for the property