Arizona Copper Company | VRP Site

Location: 

US Hwy 191 and Zorilla Street, Clifton, Ariz.

Acceptance Into Voluntary Remediation Program (VRP):

Jan. 24, 2001

Contaminants of Concern (COCs):

  • Metals

Affected Media:

  • Soil

What are My Health Risks:

For Soil | There is little to no health risk unless there is contact with skin or ingestion of contaminated soil

Site Summary:

  • Engineering controls (engineered caps and drainage systems) are in place to eliminate exposure
  • Site is currently inspected on an annual basis and after major rain events
  • Site Inspection Report submitted in May 2018
  • Site Inspection Reports were reviewed and approved in July 2018
  • Site Inspection Reports were submitted and approved by ADEQ in January 2019