My Community

image of paper cutouts of people to symbolize a community

Clifton School | VRP Site

Location: 

110 Hill Street, Clifton, Ariz.

Acceptance Into Voluntary Remediation Program (VRP):

Dec. 15, 1998

Contaminants of Concern (COCs):

  • Metals

Affected Media:

  • Soil

What are My Health Risks:

For Soil | There is little to no health risk unless there is contact with skin or ingestion of contaminated soil

Site History:

  • School was closed on 2014
  • Engineering controls in the form of engineered caps and drainage systems have been utilized onsite to eliminate exposure
  • The site and all engineering controls are currently inspected on an annual basis
  • Site Inspection Report submitted in May 2018
  • Site Inspection Reports were reviewed and approved in July 2018
  • Site Inspection Reports were submitted and approved by ADEQ in January 2019.