Posted On: Aug. 5th, 2026 - 05:32 am
On Aug. 5, 2026, the comment period begins for the proposal to renew an Arizona Pollution Discharge Elimination System (AZPDES) permit to the Arizona Department of Transportation (ADOT) for its Phase I Municipal Separate Storm Sewer System located in Arizona. The comment period ends Sept. 4, 2026.
AZPDES Permit No. AZ0026026
Permittee:
ADOT
Facility:
ADOT Phase I Municipal Separate Storm Sewer System
Arizona
ADOT applied for a renewal AZPDES permit for the proposed discharge of pollutants to Waters of the United States from the ADOT Phase I Municipal Separate Storm Sewer System in Arizona. The system is a publicly owned system of conveyances that collects and conveys stormwater and discharges directly to waters of the United States. The permit requires ADOT to continue to implement and maintain a Stormwater Management Program designed to reduce the discharge of pollutants to the maximum extent practicable. The permit establishes measurable criteria to assess the efficacy of control measure design and implementation.
Review Documents:
Public Comment Period:
Dates: Aug. 5, 2026 – Sept. 4, 2026
Comments may be submitted as follows:
- By Email | Send Email >
- By Mail (Must be postmarked or received by Sept. 4, 2026):
ADEQ
Water Quality Division, Surface Water Protection Permits
Attn: Corin Hammond
1110 W. Washington St.
Phoenix, AZ 85007