Site History
2026: The Record of Decision (ROD) is in progress. A total of 12 wellhead treatment systems have been installed at the site, with 10 in operation as one well no longer has tetrachloroethene (PCE) above the Aquifer Water Quality Standard (AWQS) and was taken offline. Private wells, monitoring wells, and treatment systems were sampled periodically (quarterly, semi-annually or annually as needed) across the site.
2025: ADEQ finalized the Proposed Remedial Action Plan (PRAP) in July, and the ROD was in progress. A total of 12 wellhead treatment systems have been installed at the site, with 11 in operation. Private wells, monitoring wells, and treatment systems were sampled periodically (quarterly, semi-annually or annually as needed) across the site.
2024: The PRAP was in progress. A total of 12 wellhead treatment systems have been installed at the site, with 11 in operation. Private wells, monitoring wells, and treatment systems were sampled periodically (quarterly, semi-annually or annually as needed) across the site. The Soil Vapor Extraction (SVE) system discontinued operations in the North Area.
2023: The PRAP was in progress. An additional wellhead treatment system was installed. A total of 12 wellhead treatment systems have been installed at the site, with 11 in operation. Private wells, monitoring wells, and treatment systems were sampled periodically (quarterly, semi-annually or annually as needed) across the site. An SVE system began operation in the North Area to mitigate subsurface impacts.
2022: ADEQ finalized the Feasibility Study (FS) in March and the PRAP was in progress. A total of 11 wellhead treatment systems have been installed, but one was taken offline because there was no longer PCE contamination affecting the well. Private wells, monitoring wells, and treatment systems were sampled periodically (quarterly, semi-annually or annually as needed) across the site. Enhanced Reductive Dechlorination (ERD) injections were discontinued in the North Area.
2021: ADEQ finalized the Remedial Investigation (RI) Report in May, and the FS was in progress. Five wellhead treatment systems were installed. A total of 11 wellhead treatment systems have been installed at the site. Private wells, monitoring wells, and treatment systems were sampled periodically (quarterly, semi-annually or annually as needed) across the site. ERD was pilot tested in the North Area and SVE was pilot tested in the South Area.
2020: ADEQ completed the RI and completed a draft RI Report. Six groundwater monitoring wells and four soil vapor monitoring/extraction wells were installed to collect additional data needed for the FS. An SVE pilot test was conducted in the North Source Area. ADEQ sampled more than 50 private domestic wells on a quarterly basis and installed four additional wellhead treatment systems as part of Early Response Actions (ERAs). A total of six wellhead treatment systems have been installed at the site.
2017 – 2019: ADEQ began the RI at the site to assess the extent of contamination and evaluate options to address the contamination. ADEQ regularly sampled private domestic wells to monitor site contaminants. Two wellhead treatment systems were installed on private domestic wells as part of ERA to prevent exposure to site contaminants.
2016: The Highway 260 and Main Street site was placed on the WQARF Registry on December 12, with an eligibility and evaluation score of 40 out of 120.
2015: After the ADEQ Hazardous Waste Program actions ceased, ADEQ Remedial Projects conducted a follow up Prelimnary Investigation (PI) to collect additional information regarding the release(s) to groundwater. An October sampling event found PCE, trichloroethene, and cis-1,2-dichloroethene in several wells across the site. Only PCE was detected above the Aquifer Water Quality Standard (AWQS) in two private domestic wells, at concentrations of 8.6 and 20 micrograms per liter (µg/L). The sample with PCE at 8.6 µg/L was detected in a public water system. The site was recommended for listing on the WQARF Registry.
2006 – 2007: ADEQ conducted a PI to identify sources of PCE in the well at the Swanson RV Park. Groundwater and soil gas sampling identified two potential source areas: Cottonwood Cleaning & Bridal Boutique at the corner of Main Street and Aspen Street and Cottonwood Quality Dry Cleaning at the corner of Main Street and Camino Real. Field investigation found PCE at concentrations of up to 340 µg/L in groundwater and as high as 1,200 micrograms per cubic meter (µg/m3 ) in soil gas near Cottonwood Cleaning & Bridal Boutique. Similarly, PCE was found at concentrations of up to 170 µg/L in groundwater and as high as 450 µg/m3 in soil gas near Cottonwood Quality Dry Cleaning. Both dry cleaner facilities were actively operating, and the findings were referred to the ADEQ Hazardous Waste Program for further action.
2005: In August, owners of the Swanson RV Park filed a complaint with ADEQ pertaining to PCE contamination in a drinking water well. Water in the well contained PCE at a concentration of 8.5 µg/L, which is above the AWQS of 5 µg/L.