Skip to main content

Public Water System Design Review Fees

— New FY25 Water Fees | Starting Aug. 1, 2024 —

See the bottom of the page for details.

Water Fees

Public Water System Design Review

There is a flat fee per new component for design review services for public water systems.

Public Water System Design Review Application Types

Fee

Approval to Construct Public Water Supply Distribution System (Waterline):       

Number of Service Connections:  
  150 or fewer (or 0 connections with 500+ ft of line)

151 to 300 
301 to 450 

451 to 600

601 to 750 

Each additional 150

 

 

 

$1,284
$1,998

 

 

$2,711

 

$3,425

$4,138

Add $714

Water Treatment Plants and Blending Plans (including new source approval if applicable):

< 0.1 Million gallons per day (MGD)

 

≥ 0.1 MGD and < 1 MGD

 

≥ 1 MGD and < 5 MGD

 

≥ 5 MGD

 

 


$2,141

 

 


$2,854

 

$4,281

 

$7,135

Well (including new source approval if applicable)

$1,784

Storage Tank

$1,142

Booster Pump

$1,142

Main Line Extension (less than 500 ft of line)

$357

Chlorinators/Disinfection Devices

$357

Extension of Time to Construct

50% of the app fee, not to exceed $714

Priority Review Fee (Department authorization required)

Double the Standard Fee

 

 

Water Fees

New FY25 Public Water System Design Review

There is a flat fee per new component for design review services for public water systems.

Public Water System Design Review Application Types

Fee

Approval to Construct Public Water Supply Distribution System (Waterline):       

Number of Service Connections: 
 

  150 or fewer (or 0 connections with 500+ ft of line)

151 to 300 
301 to 450 

451 to 600

601 to 750 

Each additional 150





$1,320 

$2,050
$2,790

$3,520

$4,250

Add $730

Water Treatment Plants and Blending Plans (including new source approval if

applicable):

< 0.1 Million gallons per day (MGD)

 

≥ 0.1 MGD and < 1 MGD

 

≥ 1 MGD and < 5 MGD

 

≥ 5 MGD

 

 

 

 

 

$2,200

 


$2,930

 

$4,400

 

$7,330

Well (including new source approval if applicable)

$1,830

Storage Tank

$1,170

Booster Pump

$1,170

Main Line Extension (less than 500 ft of line)

$370

Chlorinators/Disinfection Devices

$370

Extension of Time to Construct

50% of the app fee, not to exceed $730

Priority Review Fee (Department authorization required)

Double the Standard Fee