Permit(s) needed for a Foundry
Revised on: June 14, 2016 - 11:31am
A foundry is a factory that produces metal castings.
You may need all or some of the following permits:
If you have a boiler + generator, you may need an Air Quality Individual Permit | Learn More >
If you have hazardous waste to dispose of, you may need an Application for an EPA ID Number | Learn More >
If you have underground storage tank, may need a Notification of UST Form | Learn More >
1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
1.08 GP: Toilet or Privy : “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”
2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More >
2.03 GP: Hydrologic Tracer Studies | Learn More >
3.01 GP: Lined Impoundments | Learn More >
3.03 GP: Vehicle and Equipment Washes | Learn More >
3.07 GP: Tertiary Treatment Wetlands | Learn More >
If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | Learn More >
If you have a drywell, you may need a Drywell Registration | Learn More >
If your industry has stormwater discharges, you may need an AZPDES MSGP Industrial Stormwater or No Exposure Certification | Learn More >
This listing may not be comprehensive depending upon the specifics of your facility. Additional permits or registrations may be needed, therefore ADEQ recommends you contact the Permit Liaisons if unsure of permit requirements.