WQD | DW | Sanitary Survey
Microbiological Sample Siting Plan (MSSP) — All public water systems are required to have an MSSP. The purpose of the MSSP is for the facility to have a standard written procedure to follow for monthly total coliform samples as required by the Revised Total Coliform Rule. The plan also helps ADEQ verify that sample locations are suitable and representative of the distribution system.
- MSSP for population less than 1000 | View/Download >
- MSSP for population more than 1000 | View/Download >
Lead and Copper Sampling Plan — All community and non-transient non-community water systems are required to have a lead and copper sampling plan. The purpose of the plan is to identify sites that have lead pipes, copper pipes with lead solder, and/or are served by lead service lines | Learn More >
- Lead and Copper Sampling Form | View/Download >
Emergency Operations Plan (EOP) — All community water systems, regardless of size, are required to develop and maintain an EOP. The EOP details physical and technical aspects of water systems operation, such as maintaining proper water pressure, collapse of a major structure, loss of mechanical components like pumps or valves and alternate water supplies. The EOP should also address public notice procedures for consumers and regulatory agencies.
- EOP Template | Download (.docx) >
Stage 2 Disinfection Byproducts Plan (Stage 2 DBP) — A Stage 2 DBP plan is required of community water system or non-transient non-community water systems that use a primary or residual disinfectant other than ultraviolet light or deliver water that has been treated with a primary or residual disinfectant other than ultraviolet light.
- Stage 2 DBP Templates | Download (.zip) >
These include records of routine component operations and maintenance (pumping rates, well maintenance, treatment system maintenance, component repairs, etc.).
- Operations and Maintence Manual Template | Download (.docx) >
Monitoring records are required to be kept on site for a determined amount of time depending on the type of records. Generally records are required to be kept between three and 10 years. Sampling schedules and monitoring history can be reviewed on the Safe Drinking Water Information System (SDWIS) website | Visit SDWIS Website >
Testable backflow prevention devices are required to be tested annually by a certified tester. PWSs are required to retain testing records for at least three years | Learn More >
The facility walkthrough will include a review of all system components including wells, surface water intakes, storage tanks, pressure tanks, disinfection (e.g., chlorinators), treatment systems, etc. All water system facilities should be unlocked and accessible for the ADEQ inspector to conduct the sanitary survey.
System facilities should be routinely inspected by the certified operator. ADEQ encourages remote system operators to use the Certified Operator Monthly Inspection Form when conducting their monthly inspection | Download Operator Monthly Inspection Form >
Once the walkthrough is completed, the inspector will review the system’s distribution and treatment grades. PWSs are graded from 1-4 based upon a point system that assigns a predetermined number of points per system characteristics. The grade corresponds with the level of system complexity, with Grade 1 being the most simple and Grade 4 being the most complex. All PWSs require an operator in direct charge who is certified at or above the grade of the facility.
Once the sanitary survey is completed, the inspector will review the findings with the onsite representative. Potential deficiencies and the follow-up process will be discussed if necessary. The finalized inspection report and the Notice of Inspection Rights will be provided to the responsible party following the sanitary survey.