Skip to main content

Permit(s) needed for a Pulp and Paper Mill

Permit(s) needed for a Pulp and Paper Mill

Revised On: May. 13, 2024 - 3:00 p.m.

What is a Pulp and Paper Mill:

The following is a required permit when running a Pulp and Paper Mill in Arizona:

If you have a boiler + generator, you may need an Air Quality Individual Permit | Learn More >

You may also need all or some of the following permits:

If you have a boiler, may need a Boiler Facilities GP | Learn More >

If you have hazardous waste to dispose of, you may need an Application for a Hazardous Waste EPA ID Number | Learn More >

If you have a waste or TSD facility, you may need a Solid Waste Facility Plan Approval | Learn More > 

 

1.04 GP: Discharge from a Facility that Receives Water from a Well if Discharge is to the Same Aquifer: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

1.05 GP: Discharge of Backwash or Condensate if less than 1000 Gallons Per Day: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

1.08 GP: Toilet or Privy: “Type 1 General Permit: No notification is required, however, best management practices (BMPs) must be followed.”

2.01 GP: Drywells that Drain Areas with Hazardous Substances | Learn More >

2.03 GP: Hydrologic Tracer Studies | Learn More > 

3.01 GP: Lined Impoundments | Learn More > 

3.05 GP: Disposal Wetlands | Learn More > 

3.03 GP: Vehicle and Equipment Washes | Learn More > 

3.07 GP: Tertiary Treatment Wetlands | Learn More > 

 

If you discharge pollutants into water, you may need a 208 Consistency Review Authorization | Learn More >

If your industry has stormwater discharges, you may need an AZPDES MSGP Industrial Stormwater or No Exposure Certification | Learn More > 

If using reclaimed water, you may need a Direct Reuse of Reclaimed Water Individual Permit | Learn More > 

If you have a drywell, you may need a Drywell Registration | Learn More > 

State Water Quality Certification, CWA Section 401 | Learn More >

If you discharge pollutants into US waters, you may need an AZDPES Individual Permit | Learn More >

If you discharge water pollutants, you may need an Individual APP | Learn More >  

If you temporarily need to discharge water pollutants, you may need a Temporary Individual APP | Learn More >